Advertisement

Distance
1,689 km
Journey time
28h 45m
Total stops
18
Avg speed
59 km/h
Halts
16
Days on route
2

About DDR SFG SF SPL

DDR SFG SF SPL (train number 04176) is a Special on the Indian Railways network running between DADAR (DDR) and SUBEDARGANJ (SFG). It departs DADAR at 00:15 and reaches SUBEDARGANJ at 05:00. The train covers about 1,689 km and halts at 18 stations along the way, completing the run in around 28h 45m.

The DDR SFG SF SPL runs on Tue. The journey spans 2 days, so a stop marked Day 2 is reached on the 2nd day after departure — worth remembering when you plan hotel check-in or an onward connection. Its average speed across the whole route works out to roughly 59 km/h including halts.

Between its origin and destination the DDR SFG SF SPL makes 16 timed halts. Its longest scheduled stop is about 10 minutes at KOTA JN. Other notable halts include SURAT (5 min), CHHAYAPURI (5 min), RATLAM JN (5 min), GANGAPUR CITY (5 min), IDGAH AGRA JN (5 min). These longer stops are good points to fetch food or water, though shorter one- and two-minute halts mean you should be ready to board in advance.

DDR SFG SF SPL Schedule & Running Days

Weekly running days and the station-by-station time table from DADAR to SUBEDARGANJ.

Running days (departs DADAR)

Mon
Tue
Wed
Thu
Fri
Sat
Sun
#StationArrivesDepartsHaltDayDistance
1 DADAR Source
DDR
— 00:15 — Day 1 0 km
2 BORIVALI
BVI
00:40 00:43 3 min Day 1 24 km
3 VAPI
VAPI
02:38 02:40 2 min Day 1 164 km
4 SURAT
ST
04:17 04:22 5 min Day 1 257 km
5 CHHAYAPURI
CYI
06:40 06:45 5 min Day 1 394 km
6 RATLAM JN
RTM
09:30 09:35 5 min Day 1 648 km
7 KOTA JN
KOTA
14:00 14:10 10 min Day 1 914 km
8 SAWAI MADHOPUR
SWM
15:00 15:02 2 min Day 1 1,022 km
9 GANGAPUR CITY
GGC
16:05 16:10 5 min Day 1 1,085 km
10 BAYANA JN
BXN
17:30 17:32 2 min Day 1 1,162 km
11 RUPBAS
RBS
18:03 18:05 2 min Day 1 1,196 km
12 FATEHPUR SIKRI
FTS
18:20 18:22 2 min Day 1 1,211 km
13 IDGAH AGRA JN
IDH
19:10 19:15 5 min Day 1 1,245 km
14 TUNDLA JN
TDL
21:30 21:35 5 min Day 1 1,269 km
15 ETAWAH JN
ETW
22:48 22:50 2 min Day 1 1,361 km
16 GOVINDPURI
GOY
01:45 01:50 5 min Day 2 1,497 km
17 FATEHPUR
FTP
02:58 03:00 2 min Day 2 1,576 km
18 SUBEDARGANJ Destination
SFG
05:00 — — Day 2 1,689 km

Recent Chart Vacancy

Vacant berths recorded after chart preparation on the last 2 runs of DDR SFG SF SPL. See the full vacancy page for 04176 — class breakdown, how far berths stay empty, and every coach for your own stretch.

Tue, 27 Oct 2026
785 vacant berths
S8 · 50 B2 · 56 B6 · 46 S4 · 49 S2 · 57 S7 · 64
Check live vacant seats
Tue, 20 Oct 2026
497 vacant berths
S2 · 42 B3 · 39 B6 · 39 B4 · 38 S3 · 37 A1 · 36
Check live vacant seats

Frequently Asked Questions

Common questions about the DDR SFG SF SPL.

DDR SFG SF SPL runs as train number 04176 on Indian Railways.

Train 04176 DDR SFG SF SPL runs between DADAR (DDR) and SUBEDARGANJ (SFG), stopping at 18 stations in total.

Train 04176 DDR SFG SF SPL covers about 1,689 km and takes roughly 28h 45m from origin to destination, at an average speed of around 59 km/h.

Train 04176 DDR SFG SF SPL runs on Tue from its origin station. Running days always refer to the departure day at the source.

Train 04176 DDR SFG SF SPL has its longest scheduled halt of about 10 minutes at KOTA JN.

Train 04176 DDR SFG SF SPL departs DADAR at 00:15, which is outside the 5:00 AM to 2:00 PM window, so its first reservation chart is prepared 10 hours before departure, at 14:15. The final chart follows at 23:45, 30 minutes before departure.

Schedule, running days and chart vacancy shown here are sourced from Indian Railways / IRCTC data and may change. This is not live running status. Always reconfirm timings and availability on the official railway channels before you travel.

Vacant seats on this train?

See which berths fall empty after the chart is prepared for train 04176.

Vacant Seat Finder

Check another train

Look up running days and full route timings for any train.

Train Schedule Checker

When does booking open?

Find the exact 60-day advance booking date for your journey.

Date Calculator
Booking Tips & Guides
Complete Guide to Common Indian Railways Abbreviations

Understand all commonly used Indian Railway abbreviations and never again get co...

Sep 7, 2026 4 min
How to Find Vacant Seats in a Train After Chart Preparation?

Learn how to check vacant train seats after chart preparation using the official...

Sep 7, 2026 8 min
What is 3E in Train? 3E vs 3A Coach Difference and Fare

3E is AC 3-Tier Economy: 83 berths against 72 in 3A, a side middle berth that 3A...

Sep 6, 2026 7 min
Advance Reservation Period: The 60-Day IRCTC Booking Rule

The advance reservation period is 60 days, counted back from the journey and exc...

Sep 5, 2026 6 min
How Many IRCTC Tickets Can You Book in a Month?

Twelve a month on a normal IRCTC account, twenty-four if it is Aadhaar-verified ...

Sep 5, 2026 6 min